Project Details
The project covers an 11.76 km section of the Madrid–Barcelona–French Border High-Speed Line, with a 14 m width and 350 km/h design speed. Earthworks include 2.3 million m³ of excavation and 1.65 million m³ of embankment, together with 3 viaducts measuring 212 m in total plus 42 m. Structures comprise 1 rock tunnel measuring 330 m with a 95 m² section, 9 vaulted underpasses, 3 frame underpasses, and 3 overpasses measuring 43 m with a 17 m span.

Services Provided:
- BEWS Was Responsible For:
- Construction Design & Supervision.
- Quality Management & Control.
- Budget & Cost Management.
- Project Planning & Monitoring.
- Technical Engineering Support.