Clients
The Ministry of Public Works
The Ministry of Public Works
Category
Bridges & Tunnels
Bridges & Tunnels
Location
Farwaniya, KUWAIT
Farwaniya, KUWAIT
Date
2023
2023
Status
Completed
Completed
Budget
N/A
N/A
Project Details
Upgrading the Abdul Kareem Al Khattabi street, from the interchange of the 5th Ring Road/Fahaheel Expressway to Tawin Street, in addition to redesigning the interchange configuration of the 4th Ring Road/Fahaheel Expressway. Part of the project consisted of three Pedestrian Crossings constructed over Abdul-Kareem Al-Khattabi St.. The pedestrian consists of 2 equal spans with total length of 70 m and have a walk-way width of 3 m.

Services Provided:
- Transportation Planning
- Environmental and Social Impact Assessments
- Geotechnical Investigation
- Structural Design
- Architectural Design
- STAFF EXPERIENCE


