Clients
Makkah Development Authority
Makkah Development Authority
Category
Bridges & Tunnels
Bridges & Tunnels
Location
Makkah, KSA
Makkah, KSA
Date
2023
2023
Status
Completed
Completed
Budget
200 Million USD
200 Million USD
Project Details
The extradosed bridge carries part of the Third Ring Road in Mecca. It consists of two bridges, each for one traffic direction. The main span is 145 m, crossing the pedestrian route to the Jamarat area. The 2 m deep deck has two edge girders connected by transverse girders spaced about 6 m. It is rigidly connected to the pylon and supported on sliding bearings at the piers and abutments. The bridge is skewed 34° and cast in place

Services Provided:
- Road Design.
- Structural Design.
- Traffic Management.
- Hydrology Study.
- Tender Documents.
- Construction Supervision.


